Infriggincredible.
![]() |
| Boats motor into the "dry-dock". Lockmasters move the boat over the slings. |
![]() |
| The whole thing moves forward and up; the slings do not get raised; the water drains away beneath them. |
![]() |
| Then it moves up and over the hill between the two pools. Over a highway (crossing-gates down). |
![]() |
| Detail showing the wheels on the tracks. |
![]() |
| View of the marine railway from below. The blue line is where boats tie up while waiting their turn on the train. |
![]() |
| Slings hold the boat as the car comes up out of the water. |
After passing through (well, up and over) the "lock", we tied up at one of the docks and spent the night. And
stayed all the next day and night.
Finally got the temporary antenna rigged up so we have some VHF while
the mast is down – not too important on the canal but critical for our
crossings of Lakes Simcoe and, of course, Ontario.
Made arrangements to park our boat at a marina in Orilla Ontario next week – so we can spend several days with Naomi, Clayton &
Stephanie in suburban Toronto. They will pick us up on Sunday afternoon.
Only 2 locks to go until that marina – plan to do them
tomorrow AM before the crowds.
This is the big 3-day holiday weekend in Canada, so – of course-
everyone is here and out on the water or in the anchorages or docks.









No comments:
Post a Comment